Warehouse relocation in Washington needs a destination plan that separates heavy service inventory from fast-moving distribution stock. An energy supply operation may carry dense parts beside lighter cartons, while a last-mile facility needs frequent access to dispatch positions. Existing pallet rack should be assigned by those loads and movements rather than by its former row numbers.
Southpointe and Meadow Lands operations connect with I-79 and I-70, making transfer coordination part of a wider shipping day. Warehouse Equipment & Supplies Co., our parent, started selling and installing storage systems in 1997.
Washington warehouse relocation details begin with load assignments
Record the heaviest pallet for each stock group and the intended beam elevations in the receiving building. A valve pallet and a consumer goods pallet may occupy similar footprints without imposing similar demands. Check frame and beam specifications against the proposed arrangement, and identify damaged parts for replacement with new components.
Create new layout drawings showing columns, doors, handling routes, and installation zones. Newer Washington County bulk or flex buildings may allow a different storage profile, but available height is not a capacity rating. Compatible new rack can add positions where the existing equipment cannot meet the planned configuration or storage requirement.
How rack relocation is phased across Washington County sites
Establish a working destination section before committing every remaining bay to teardown. experienced crews on a schedule we manage need access to grouped components, while the operating team needs clear ownership of live shipping areas. Connect each equipment transfer to the inventory that will follow it.
Define the operating handoff
List stock that must remain available at the original address and identify its destination zone. For a Route 19 corridor facility, include unloading assignments and the internal route from receiving to the first completed positions.
Inspect and identify steel
Document frame sizes, beam connections, accessories, and visible damage. Separate rejected pieces for new replacement components and label accepted bundles by planned assembly group so the receiving team can locate what each row needs.
Dismantle and transport groups
Clear inventory from the released section before teardown. Coordinate transport with space at the new building, leaving enough room for normal stock handling instead of sending dismantled steel into an already occupied staging area.
Install and release positions
Reassemble the system to the reviewed drawings, anchored to the floor according to its design. Confirm the arrangement and assigned loads before returning pallets, then move the next group as the shipping plan allows.
Why warehouse relocation should follow Washington shipping demand
Energy supply and regional distribution do not always share the same stock priorities. Keep urgent service parts accessible while relocating slower material first where practical. A phased approach makes those priorities explicit and reduces the chance that required inventory sits between buildings without an available storage position.
At Southpointe or Meadow Lands, winter deliveries also need an unloading plan that accounts for conditions and indoor staging. Avoid treating a large receiving building as unlimited laydown space. Organized component groups and clear travel paths matter throughout the move, not only when the first new row is assembled.


Operations We Rack Around Here
Set Washington transfer priorities by required order access rather than by whichever row is easiest to dismantle first.
Washington sites changing buildings can use the related pages listed next.
Warehouse Rack Systems
Storage configurations for pallet handling, long material, and case picking.






Get a Warehouse Relocation Quote for Your Washington Warehouse
Send Washington building drawings, pallet weights, and component photographs so the move scope can distinguish accepted steel, replacements, and additions for warehouse relocation. Call (412) 866-1406.
Pittsburgh Pallet Racks
2681 Sidney St.
Suite D
Pittsburgh, PA 15203
(412) 866-1406Monday - Friday: 8:00 AM - 6:00 PM
Washington warehouse relocation scope questions
Other Storage Services in Washington

Pallet Rack
Every pallet reachable, every time. The baseline we size everything else against.
View details
Pushback Rack
Two to six pallets deep from one aisle, without giving up much reach.
View details
Carton Flow Rack
Cases advance to the picker instead of the picker hunting for cases.
View details
Cantilever Rack
Arms with nothing in front of them, built for lumber, pipe, and anything a pallet can't hold.
View details
Pallet Flow Rack
Load one side, pick the other, and let gravity enforce first in, first out.
View details
Drive-In Rack
Forklifts enter deep storage lanes, trading individual pallet access for bulk storage capacity.
View detailsNearby Areas We Also Serve
Canonsburg and Bethel Park are nearby areas to consider when the storage transfer spans the I-79 corridor.
Where We Work
Located in Pittsburgh, we serve the entire Greater Pittsburgh metro with industrial pallet racks and warehouse storage solutions.
Pittsburgh Pallet Racks
Address
2681 Sidney St.
Suite D
Pittsburgh, PA 15203
Phone
(412) 866-1406Business Hours
Monday - Friday: 8:00 AM - 6:00 PM
Saturday: Closed
Sunday: Closed
Need Warehouse Relocation in Washington?
Call (412) 866-1406 or request a quote and we will get a layout started.